Product Engineering - Quality Management
How To : Use the Standard Task template
The Standard Task setup integrates QM with manufacturing. See Design Detail : Manufacturing Integration.
| Field | Description |
|---|---|
| Standard Task | Select a standard task code. |
| Routing Status | Select a routing status: [Blank], Planned, In Progress, Finished. The standard task is retrieved from the following table: 83 Item Journal Line. |
| Measurement Template | Select a measurement template. When an incident of type Material is created, the system searches for a measurement template in this sequence: 1. Standard Task Templates, 2. Service Item Group Templates, 3. Item Templates, 4. Item Category Templates. |
See also
Tasks
Reference
Feedback
Submit feedback for