Product Engineering - Quality Management

How To : Use the Standard Task template

The Standard Task setup integrates QM with manufacturing. See Design Detail : Manufacturing Integration.

Field Description
Standard Task Select a standard task code.
Routing Status Select a routing status: [Blank], Planned, In Progress, Finished. The standard task is retrieved from the following table: 83 Item Journal Line.
Measurement Template Select a measurement template. When an incident of type Material is created, the system searches for a measurement template in this sequence: 1. Standard Task Templates, 2. Service Item Group Templates, 3. Item Templates, 4. Item Category Templates.

See also

Tasks

Reference