This table shows the release information for Industrial Equipment Manufacturing (formerly: Jobs Management Suite). Release information is listed per build number where the latest build is on top of the list.
| Build | Minimal Version | Date | Work Item | Description |
|---|---|---|---|---|
| 27.5.123339.0 | 26.1.123339.0 | 2026-03-17 | 230043 | Define a New Application Type: Re-use |
| 2026-03-17 | 230044 | Link Re-use Items to Higher Assemblies (From Task Field) | ||
| 2026-03-17 | 230045 | Exclude Re-use Items from Double Demand in Planning | ||
| 2026-03-17 | 230046 | Consume Re-use Components in Production/Consumption Journals - Move Reservation | ||
| 2026-03-17 | 230047 | Post Costs When Re-use Production is Finished (Critical) | ||
| 2026-03-17 | 239308 | Updating the number series using the TAB key. | ||
| 2026-03-17 | 230048 | Allow Planned Returns for Items | ||
| 2026-03-17 | 230050 | Update Project Ledger for Returns | ||
| 2026-03-17 | 228126 | Must be able to create purchase quotes for a project quote | ||
| 2026-03-17 | 228141 | The invoice template lines must also show Payment Terms and Payment Method | ||
| 2026-03-17 | 230063 | Trigger Warranty Setup on Deliverable Registration | ||
| 2026-03-17 | 230064 | Capture Warranty Parameters in Pop-Up | ||
| 2026-03-17 | 230065 | Update All Service Items Linked to Service Object | ||
| 2026-03-17 | 231594 | Synchronize a purchase order line with the project planning line | ||
| 2026-03-17 | 212541 | The copy time sheet lines actions does not copy resource tasks | ||
| 26.5.121702.0 | 26.1.121702.0 | 2026-01-13 | 230414 | Assembly order throws error on usage link |
| 2026-01-13 | 229808 | Production Planning with resources not correct | ||
| 2026-01-13 | 229629 | Wrong error message from project planning line | ||
| 2026-01-13 | 225396 | Create project containers for miscellaneous items and resources | ||
| 2026-01-13 | 234782 | Job task line is not editable when lifecycle status in under Edit (IEM lifecycle app) | ||
| 2026-01-13 | 210300 | You must be able to select a contact in the Create Interaction and - To-Do wizards | ||
| 2026-01-13 | 234491 | A new Change Status action is introduced in ECO page to change the status to Approved | ||
| 2026-01-13 | 222318 | Unable to bill billable lines in different currency than default | ||
| 2026-01-13 | 226055 | Not possible to add billable line to task type Milestone | ||
| 2026-01-13 | 225315 | Project WIP and Expected WIP does not show detail | ||
| 2026-01-13 | 231594 | Synchronize a purchase order line with the project planning line (feature 184809 - DevOps2486) | ||
| 2026-01-13 | 234085 | Tenant ID Message in Project Task Details | ||
| 2026-01-13 | 233909 | Time Posting Worksheet page caption change | ||
| 26.5.119568.0 | 26.1.119568.0 | 2025-10-22 | 227144 | Expand assembly bom quantity not updated when the set is expanded |
| 229808 | Production Planning with Resources not correctly calculates the needed capacity | |||
| 228174 | History action in IEM-Project Manager role center must have a link to Project Archive | |||
| 228859 | Project Budget Line must show margin amount and percentage | |||
| 225078 | Added the Project Task Workorder report to the Project | |||
| 224608 | NL Translation updates | |||
| 228465 | Change page caption to IEM Project Task Lines to distinguish from the Archived Project Task Lines | |||
| 227164 | Project Planning Line Application type must be copied when expanded | |||
| 228390 | Your license does not grant you the following permissions on TableData 5802 Value Entry: Modify. | |||
| 218404 | Resource availability not re-calculated in the Resource Availability Page | |||
| 225178 | Assembly Order Posting in whse WHITE prohibits access to Container Worksheet | |||
| 225888 | Create project containers for miscellaneous items and resources | |||
| 224672 | Bin Code error when changing the status to of Production order to Finished (Warehouse Scenario) | |||
| 225114 | Bin code error when posting Assembly order when Transfer Details to Project is set to true in Assembly Setup | |||
| 224573 | Cross Dock Issue-Transport Type is Not getting updated in Container worksheet | |||
| 224665 | Location Code in project card must be updated in Project card as per project template | |||
| 210300 | You must be able to select a contact in the Create Interaction and - To-Do wizards | |||
| 230053 | Allow Creation of Purchase Quotes from Project (Quotation Stage) | |||
| 26.2.115411.0 | 26.1.115411.0 | 2025-06-24 | 223692 | IEM Application 26 Version Release Process-Project inventory pick issue fix |
| 211410 | Automation of Test case 210729-Create purchase quote from Project planning line and Post (WH-White loc with Lot item) | |||
| 219057 | Element and Activity not copied to the Project Ledger Entries | |||
| 223460 | Description 2 Field Addition-Job Billable Line page | |||
| 220598 | Must check on element and activity when linking a PO to a Project | |||
| 218905 | Project Assembly BOM updates the standard Assembly BOM | |||
| 216817 | AssemblyOrder Posting in whse WHITE prohibits access to Container Worksheet | |||
| 209595 | IEM-ANY process development - Time Registration process for BC Anywhere | |||
| 25.5.113911.0 | 25.0.113911.0 | 2025-05-07 | 220422 | CS00236842 - Not possible to post positive inventory balance |
| 220222 | Updated Assisted User Setups and AboutText descriptions | |||
| 25.5.113639.0 | 25.0.113639.0 | 2025-04-30 | 219057 | Element and Activity were not copied to the Project Ledger Entries when posting the Project Planning Line |
| 219684 | CS00236694 - Project billing in another currency than LCY created an error when posting the sales invoice | |||
| 219556 | Added an IsHandled boolean to IEMJobTaskSuscr.codeunit.al OnAfterOnInsert Event | |||
| 218485 | Too many purchase quotes are removed, only when created from the project purchase quotes will be archived as part of the Make Order action | |||
| 217362 | Cannot consume resource time from a service order | |||
| 209819 | When a Service Item is created from an Item with a BOM also the BOM components are copied to the Serice Item Components | |||
| 218413 | CS00236536 - Item gets different purchase price depending how purchase order was created | |||
| 209816 | Copy Project Task comments to Inventory/warehouse picks comments | |||
| 217894 | Align IEM Warehouse functions with BC26 warehousing for projects - in progress, waiting for extension point | |||
| 25.4.111717.0 | 25.0.111717.0 | 2025-03-04 | 215471 | Permissions on Job Registers were not set when posting the Propject Planning line |
| 213939 | The Create Project wizard does not accept a Contact - Customer Template combination | |||
| 211223 | Corrected usage category on the Posted Transport Costs list so the page shows up in Search | |||
| 25.3.110696.0 | 25.0.110696.0 | 2025-02-05 | 203701 | You should be able to open the Project from the message (reworked) |
| 210567 | Create a new Ship-to address for custom addresses | |||
| 212089 | Bill-to customer changed when adding a new billable line | |||
| 212514 | Qty. to Transfer to Journal not 0 when copy a JBL to a JPL for a whse location | |||
| 212531 | Job Relation table not correct when a corrective credit memo has been created | |||
| 212565 | Time sheet line is showing too many fields | |||
| 212567 | Job No. not visible when opening Billable Lines page from Project Manager role center | |||
| 25.2.109757.0 | 25.0.109757.0 | 2025-01-08 | 180611 | NEW Update Outbound Date Calculation on the project planning line with Planned Shipment Date |
| 193597 | NEW Activated planning line status "Completed", automatically set when remaining quantity = 0 | |||
| 203442 | FIX Project Summary report must show the data only for individual projects instead it is showing data for all projects(Supply fast tab). | |||
| 203443 | FIX IEM Project Relation table is not being updated when using the Copy Document functionality. | |||
| 203701 | NEW You can now open the Project from the Sales Quote Make Order confirmation message | |||
| 205820 | NEW The field Task Billing Method has been added to the Project Template | |||
| 206133 | NEW Project Control Suite No. Series aligned with the Business Central redesigned No. Series module in BC24 | |||
| 206978 | NEW Resource Management No. Series aligned with the Business Central redesigned No. Series module in BC24 | |||
| 206979 | NEW Manufacturing & Service Integration No. Series aligned with the Business Central redesigned No. Series module in BC24 | |||
| 207413 | FIX Project - Planning Lines report error on validating IEM Line type | |||
| 207702 | FIX Billable lines must not create separate invoices | |||
| 207983 | FIX Broken link in the bcdocs.staedean.com help pages | |||
| 208495 | FIX Usage Link Field was set to TRUE in the Billable lines which triggers a check on remaining qty throwing an error | |||
| 208706 | FIX Wrong Archive message when changing the status in the Create Project wizard | |||
| 208754 | FIX It was not possible to create a purchase line for a directed warehouse | |||
| 210226 | FIX Currency factor was not filled when changing to a customer with a different currency | |||
| 210299 | NEW You can now specify a role in the project for a contact | |||
| 210359 | FIX Crossdocking in projects for transfer orders was not working | |||
| 210433 | FIX Purchase credit memo data is not visible in Project Summary report and Rcvd. not consumed data is not updating as per location. | |||
| 210713 | FIX It must be possible to add multiple lines to a Pick from a planning line | |||
| 25.1.107852.0 | 24.0.107852.0 | 05-11-2024 | 195928 | You should not be able to select a blocked resource in the Create Project wizard |
| 202921 | Project summary report not showing in Purchase Invoice | |||
| 206075 | Not able to move JPL in the Visual Job Scheduler | |||
| 206518 | Cannot post invoices to Milestone Tasks | |||
| 24.5.106782.0 | 24.0.106782.0 | 08-10-2024 | 195513 | Name change to STAEDEAN now also includes the publisher name |
| 196947 | NEW Added a "Received not consumed" column to the project summary | |||
| 203969 | NEW Setting in Project setup to suppress the warning about an empty line type in the project journal | |||
| 202108 | NEW The bill-to customer field on the project billable line is now populated and aligned with the Multiple Customers setting on the project | |||
| 202326 | NEW The check on using Elements and Activities is now split | |||
| 200410 | FIX - CS00234317 Error when posting a sales invoice with 2 billable lines | |||
| 203680 | FIX Binding error when posting a purchase invoice with 2 lines | |||
| 200446 | FIX Changed the error message"You cannot dele %1 because one or more stage payment lines are associated | |||
| 200669 | FIX Link G/L Account line to Item Planning line only works for one item at a time | |||
| 200708 | FIX Warehouse settings must be validated when releasing a planning line | |||
| 200728 | FIX Project relation list not updated when moving a planning line | |||
| 24.4.104425.0 | 24.0.104425.0 | 06-08-2024 | 195513 | Name change to STAEDEAN (kept To-Increase B.V. as publisher) |
| 195528 | You should not be able to select a blocked resource in the Create Project wizard | |||
| 195932 | When selecting a Vendor in the project planning line you should not see the blocked vendors | |||
| 195934 | When inserting an Element code on a project task the description must be copied from the project element | |||
| 196368 | Project planning page from the Project Card is missing a filter | |||
| 196914 | Description must show in Purchase Order Line table Job Line Type (1002) field | |||
| 197109 | You must be able to select the blank Invoicing Method on the Project Task Line | |||
| 197128 | Line options in Project Billable Lines must be hidden | |||
| 24.2.102871.0 | 24.0.102871.0 | 05-07-2024 | 179740 | NEW A fact box was added to the Project Billable page showing the sum of Project billable lines as well as Project Task billable line. |
| 192510 | FIX When Multiple Customers is set, selecting a customer on a Project Task also updates the Customer List for the Project. | |||
| 193429 | FIX Moving a Project Planning must also move the Reservation. | |||
| 193470 | FIX Unit cost on a Project specific assembly bom was not calculated properly. | |||
| 194018 | FIX When posting items through the Project journal the Usage Link did not retrieve the correct Project Planning line. | |||
| 24.0.101221.0 | 24.0.101221.0 | 17-05-2024 | 189618 | NEW To align with Business Central 24, Jobs has been renamed to Projects. Consequently the solution name has been changed back to Industrial Equipment Manufacturing and the App name to Advanced Project Management |
| 189620 | NEW The Project Archive function also accommodates the APM Data-model | |||
| 189619 | NEW Project Task Location field is aligned with standard field and Bin code is incorporated with APM warehouse integration | |||
| 191546 | NEW IEM Customer fields on the Project Task have been marked obsolete as these have been replaced with the new BC24 Project Task billing options. See also: Customer per Project Task | |||
| 189621 | NEW The BC24 Assemble to Order fields on the Project Planning Planning are hidden as they are not in line with the APM functionality | |||
| 189034 | FIX WIP calculations were incorrect | |||
| 181629 | FIX Improve posting of the time output worksheet | |||
| 189654 | FIX Assignable Property for the AJM permission set was missing | |||
| 191489 | FIX Receiving a purchase order for a project creates 2 warehouse entries while "Control supply from Job is true" | |||
| 192071 | FIX Resource availability After Orders did not show the correct quantity | |||
| 192447 | FIX Location Code error in the Order Planning page | |||
| 23.5.99997.0 | 23.0.99997.0 | 03-04-2024 | 184804 | NEW The Business Central Make Order action in Order Planning allows to either select the Active Order or the Active Line. This new feature allows you to Select multiple lines after calculating the requirements for the order and before using the Make Order action which shows an additional option: “Selected Lines”. |
| 184805 | NEW In the project planning lines you can link a line type of G/L Account to a line type of Item to add both to purchase document. | |||
| 184808 | NEW When multiple purchase quotes were created for a project planning line the Make Order action will prompt you with the question if you want to delete and archive the remaining purchase quotes. | |||
| 184809 | NEW From the purchase order line you can start a wizard allowing you to update the project planning line with updates on expected receipt date, quantity, and direct unit cost. Besides that, the wizard will allow you to add lines. | |||
| 184810 | NEW With this action you can move a project planning to another project task including reservation. | |||
| 184812 | NEW When using the Make Order action from a Sales quote to create a Project not only lines type of Item is copied to the project planning lines in the first project task but also lines type of resource and G/L account. | |||
| 184813 | NEW With this action you can now create inventory – as well as warehouse picks from the project planning line. | |||
| 179738 | NEW Pre select milestone tasks when initializing fixed price of the type Milestone. | |||
| 180045 | FIX Extended Texts were not validating the date range in Jobs | |||
| 181617 | FIX Bin code in production order was not validated. | |||
| 186464 | FIX Item card shows wrong Quantity on Job Order. | |||
| 186972 | FIX When posting a planning line for a production order item from inventory the Job Ledger Entry was not created. | |||
| 187015 | FIX Subcontracting entries were not transferred from Production WIP to Job Ledger Entries. | |||
| 187356 | FIX The Job number series in the Base Template was not used. | |||
| 187358 | FIX The application type from the Master Template Budget line was not copied to the Job Budget Line. | |||
| 187566 | FIX Surcharges were not posting from the Time Sheet. | |||
| 188542 | FIX Unit costs between planning line and purchase order was not handled correctly. | |||
| 23.5.98771.0 | 23.0.98771.0 | 07-03-2024 | 181615 | Points of completion were not set in the Production Order BOM. |
| 181840 | Bin code in the production order was not validated. | |||
| 183497 | When posting a resource task through a time-sheet with more hours than shown on the planning line and error is thrown: You are not allowed to post more than % hours. | |||
| 183564 | Update Qty. to Post with 0 in the Job Planning Line when require pick. | |||
| 183708 | Breakdown Budget-line of Resource Group and Item Category was not working correctly. | |||
| 186341 | WIP: Incorrect Budget values are used in WIP Calculation, resulting in double sales value | |||
| 23.3.97190.0 | 22.2.97190.0 | 24-01-2024 | 177366 | Cannot create Time-sheet for a delegate |
| 179653 | Update master template budget line, copy application from template to budget to planning | |||
| 179735 | The planning direction in the Create Job Wizard must overrule the planning direction in the Base Template. | |||
| 179737 | Backward calculation must show a warning when the starting date is before the work-date | |||
| 179741 | Create Job wizard selects a blank resource | |||
| 179767 | Fill Shipment date in Inventory Pick | |||
| 179923 | Error when changing bill-to customer in a Job | |||
| 180468 | When Creating a new budget from the Job card assembly components are not copied correct | |||
| 180609 | Bill-to customer not specified on the Billable line | |||
| 182247 | Payment Certificate not posting with a surcharge | |||
| 182289 | Check required when posting usage for external resources | |||
| 23.0.94650.0 | 22.2.94650.0 | 01-11-2023 | 175893 | When adding or updating elements or activities do not update the Job Task description |
| 177203 | Resource task assignment lines must not show a resource when only for a resource group | |||
| 177364 | Posting a planning line does not create a billable line when invoicing is time and material | |||
| 177365 | Hide the both budget and billable line type in the Job Journal and Purchase Line | |||
| 177396 | Fixed a permission issue on the Job Ledger Entry | |||
| 179250 | Transport type Inbound not specified when creating a container on a warehouse receipt | |||
| 179271 | Update the ETC calculation when quantity and cost ratio is fixed in a forecast calculation | |||
| 179384 | It was not possible to cross-dock a container for an inventory put-away / pick | |||
| 179417 | Cannot update the starting date for a Job when an ending date is specified | |||
| 23.0.93671.0 | 22.2.93671.0 | 11-10-2023 | 166194 | Aligned with Dynamics 365 Business Central 2023 wave 2 |
| 172619 | Fixed errors with quantities on the job planning line: decrease quantity, when registering partial quantity in a warehouse pick, reserved quantity is cancelled when a partial quantity is posted, reserved quantity is not correctly updated with partial receipt | |||
| 172635 | Resource task assignment is allowing to start same task multiple times | |||
| 172638 | Time-sheet approval from job is not shown in the Manager time-sheet for Jobs | |||
| 172683 | Order planning is not taking settings from the jon planning line | |||
| 173133 | Time-sheet posting going in a loop | |||
| 173622 | Master template line does not allow work types for resource groups | |||
| 173633 | Create ship-to addresses from contacts | |||
| 173639 | Work type lines in Master template marked obsolete | |||
| 173641 | Posting from a job journal creates a permission error | |||
| 175903 | Finish production order also creates job planning lines | |||
| 176125 | Optimized the handling of assembly BOM's on the job planning lines | |||
| 176126 | Job planning line description is now copied to the purchase order line | |||
| 176132 | Job estimate was not copying the correct number of days to the job task | |||
| 176251 | Feature set id was missing on the job ledger entry | |||
| 176368 | Fixes in Job consumption: Service Item was not created when posting an inventory pick, Posted job delivery was not created when posting an inventory pick, Undo posting was not working on the posted job delivery, Undo posting creates error when invoice method is Delivery. | |||
| 22.3.90983.0 | 22.0.90983.0 | 01-08-2023 | 166345 | Aligned with update 3 for Business Central 2023, wave 1 |
| 112549 | Completed Service Integration for the Manufacturing and Service app | |||
| 170640 | Budget lines on page Job Task Lines Sub-form (1001, ListPart) does not filter correct | |||
| 171990 | Unable to post Time-sheet with auto posting | |||
| 171840 | Bill-to customer was not handled correct on the Job Billable lines | |||
| 172617 | Fixed issue with reserved quantity in fact-box creating error when decreasing a quantity on a planning line, registering a partial quantity in warehouse pick. | |||
| 172338 | Fixed cues in Resource Management role center | |||
| 22.2.89906.0 | 22.0.89906.0 | 03-07-2023 | 168999 | Added Progress Registration for Production Orders |
| 170256 | Fixed the Control Supply from Job setting. When off posting inventory items will follow the Business Central posting scenario: a negative adjustment is created immediately following the receipt | |||
| 170461 | A query has been added as a basis for a Power BI report on Job WIP, Expected WIP and Committed WIP | |||
| 162319 | Aligned with Business Central 2023, wave 1, update 22.2 | |||
| 22.0.86865.0 | 22.0.86865.0 | 14-04-2023 | 112548 | Added Manufacturing Integration to the JMS set |
| 163681 | Completed warehouse integration aligned with BC 22 and added Transport & deliveries to AJM | |||
| 166567 | Add Job and Job Tasks to the Planning Worksheet to filter on Job Specific demand | |||
| 163639 | Added the first version of report "Job WIP and expected WIP" | |||
| 165251 | Updating job costs not working properly, trigger the "Adjust Cost - Item Entries" at posting time | |||
| 21.4.84356.0 | 21.0.84356.0 | 20-02-2023 | 159777 | Fixed a warning when creating an Assembly BOM from the Job Planning line. Assembly BOM's are only created through the action. If not the default assembly BOM is used when the assembly order is created. |
| 160910 | Upgraded the Planning Color functionality with a new line in the fact box showing the reserved qty in inventory for the planning line. | |||
| 160921 | Fixed the run-modal error when creating an Interaction from a Job | |||
| 160928 | Comment line table relation had the wrong filter. Change status from quote to open did not work when a customer was specified | |||
| 161231 | Sales Quote Lines are not updating the Job Planning Line when a Job was created from a Sales Quote | |||
| 161270 | Description on the Job Planning Line was not updating when the type and no. changes | |||
| 161589 | The Charge % in the Job's customer list was not recalculated properly | |||
| 164370 | Released the RESOURCE MANAGEMENT app | |||
| 21.2.81675.0 | 20.4.81675.0 | 05-12-2022 | 160910 | Implemented planning colors for the Job Item Planning Line |
| 160928 | Fixed the Comment boolean on the Job Task line, wrong filter | |||
| Fixed the Change Status Job from Quote to Open which did not have an option for a specified customer | ||||
| Updated the IEM Project Manager profile to AJM Project Manager profile |